This is the English version.
Would you like to visit our Russian website?
Это англоязычная версия сайта.
Перейти на русскую версию?

Price from 3 100 rub/m²

Gas, water, electricity

Last plot 12 577 m²

Land plots for production, warehousing and retail
9 km from Saint Petersburg on R-21 (E105) highway

Разметелево-21
Industrial park Razmetelevo-21
Last plot

Advantages of Razmetelevo-21:

Optimal and fast
logistics
Right on R-21 (E105) highway,
9 km from SPb Ring Road

Bus stops and Razmetelevo
road junction are nearby
Utilities
made simple
Plot connection and starting capacity package are included

Possible to increase capacity,
direct contracts with suppliers
Easy to start
production
Ownership after 1st payment,
all documents are ready

Experienced developer,
assistance on all stages

Razmetelevo-21 — best solution for SMEs!

Compare different options yourself:
Small plots available (from 2 800 m²)
Convenient location
Utilities (electricity, water, gas)
Basic utilities package included
Direct contracts with utility suppliers
No unnecessary additional services
Legal transparency
Assistance in production launch
Favorable surrounding residents
Individual
industrial
land plot

Razmetelevo-21
Large
industrial
park

You will also receive a link to the project's booklet.
By sending this form, you comply with our privacy policy

Best location for better business

Choose a tab to learn more:
Road junctions
Localities
Coordinates
Public transport
Right on the R-21 (E105) highway
Major roads:
• Saint Petersburg Ring Road (КАД) 9 km
• M-11 Moscow highway (Трасса М-11) 25 km

Logistic hubs:
• Seaport (Морской порт) 40 km
• Airport Pulkovo (Аэропорт Пулково) 30 km
Personnel-rich area
Saint Petersburg:
• Underground station Dybenko street 14 km
• Underground station Lomonosovskaya 14 km

Leningrad region:
• Vsevolozhsk town (Всеволожск) → 9 km
• Koltushi village (Колтуши) 4 km
Razmetelevo-21 is easy to find
Location:
• 9 km form SPb Ring road on R-21 (E105) highway
• Near Razmetelevo road junstion

Coordinates:
59.896437, 30.666538

Bus stops nearby
Razmetelevo-2 (Разметелево-2) → 400 m
• to Vsevolozhsk, Koltushi
• to underground station Ulitsa Dybenko
• to underground station Ladozhskaya

Mitke-Pyaki (Митке-Пяки) → 1 300 m
• to underground station Ulitsa Dybenko

Save money on utilities

Direct contracts with no intermediaries and no management companies
Utilities
Electric power supply
(from 150 kW)
Water supply
(from 2 m³ / day)
Gas supply
(from 10 m³ / hour)
Possible to increase capacity
Direct contracts with suppliers
Possible to increase capacity
Direct contracts with suppliers
Road network
Wide roads of granulated asphalt
Open drainage system
Communication
Broadband Internet

Choose a plot suiting your individual needs

Line 1

Total area: 12 500-17 500 m²

Included into price:
Electricity 300 kW
Gas 40 m³ / hour
Water 5 m³ / day

Price for m²: 3 100 rub
Line 2

Total area: 4 300-5 500 m²

Included into price:

Electricity 150 kW
Gas 20 m³ / hour
Water 3 m³ / day

Price of m²: 2 800 rub
Line 3

Total area: 2 800-4 300 m²

Included into price:

Electricity 150 kW
Gas 15 m³ / hour
Water 3 m³ / day

Price of m²: 2 800-3 050 rub
C
Free
Booked
Sold
Leave your contacts below
and receive full information on the plot:
By sending this form, you comply with our privacy policy
We have special offers and discounts:
Installment plan
up to 3 years
Ownership after
1st payment
Urban development plan for free
Offer information
Discount for 1st resident → 7%
Discount for 2nd resident → 5%
Discount for 3rd resident → 3%
Before construction
Electrification
Tap on a photo to zoom in:

We make our residents' lives easier

Ready to support and assist on every step of production launch!
Legal affairs
Utilities connection
Facilities construction
Plot development
Click to learn more:
Legal affairs
• Obtaining a building permit
• Cadastral works (division, redistribution, consolidation of land plots, change of category, type of permitted use, registration of ownership of land plots, etc.)
Utilities connection
• Design and construction of engineering networks from connection points to the borders of the production and warehouse complex
• Design and construction of engineering networks inside the production and warehouse complex
Facilities construction
• Planning and preparatory work for the start of construction works
• Construction of the entrance to the land plot
• Full construction of production and warehouse complexes (Built-to-suit)
• Design of a production and warehouse complex
• Construction of a production and warehouse complex
• Commissioning
Plot development
• Landscaping, gates, fence, lighting, installation of green spaces

Leave your request and receive a link to the project's booklet!

By sending this form, you comply with our privacy policy
Choose a tab to learn more:
Contact us
Our experience
Successful projects
We are a team
of experienced professionals
In case you have any questions, contact us, and we will do our best to find an optimal solution.

Andrey Putmakov (Андрей Путьмаков)
Head of B2B affairs

a.putmakov@fakt-group.ru
+7 (812) 604 23 24
Razmetelevo-North
another successfully launched
industrial park by our company
High occupation level:
85% already occupied
(average market occupation level is 60%)

Real business results:
8 residents have started their own production,
7 residents are completing construction works

Professional acknowledgement:
Project cited by Businessman (Коммерсантъ), Tenant.ru (Арендатор.ру), Suburban Review (Загородное Обозрение)
We're always glad
to help you at our office!

Monday-Friday: 9:30 – 17:30

Sverdlovskaya emb., 44, letter U
BC Zima, office 711 (7th floor)

Свердловская наб., 44, литера Ю
БЦ «Зима», офис 711 (7 этаж)
Plot №1
Line 3
Total area:
Area for construction:
8 561 350 rub
3 050 rub/m²
N
← 41,6 м →
← 75,2 м →
← 74 м →
2 807 м²
← 33,9 м →
2 807 m²
1 684 m²
150 kW
2 m³/day
10 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
Plot №2
Line 3
Total area:
Area for construction:
9 024 800 rub
3 050 rub/m²
N
← 34,1 м →
← 74 м →
← 56,7 м →
2 836 м²
← 31,5 м →
2 836 m²
1 701 m²
150 kW
2 m³/day
10 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
Plot №3
Line 3
Total area:
Area for construction:
12 538 200 rub
3 050 rub/m²
N
← 56,6 м →
← 56,5 м →
← 71,1 м →
4 344 м²
← 52,5 м →
4 344 m²
2 606 m²
150 kW
3 m³/day
15 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
Plot №4
Line 3
Total area:
Area for construction:
15 366 400 rub
2 800 rub/m²
N
← 78 м →
← 71,2 м →
← 68,4 м →
5 448 м²
← 77,4 м →
5 448 m²
3 288 m²
150 kW
3 m³/day
15 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
Plot №5
Line 2
Total area:
Area for construction:
15 484 000 rub
2 800 rub/m²
N
← 77,4 м →
← 62,9 м →
← 54,4 м →
4 552 м²
← 77,5 м →
4 552 m²
2 731 m²
150 kW
3 m³/day
20 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
Plot №6
Line 2
Total area:
Area for construction:
12 415 000 rub
2 800 rub/m²
N
← 52,5 м →
← 55,4 м →
← 62,9 м →
4 300 м²
← 67,1 м →
4 300 m²
2 580 m²
150 kW
3 m³/day
20 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
Plot №7
Line 2
Total area:
Area for construction:
15 859 000 rub
2 800 rub/m²
N
← 52,5 м →
← 55,4 м →
← 62,9 м →
5 530 м²
← 67,1 м →
5 530 m²
3 319 m²
150 kW
3 m³/day
20 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
Plot №8
Line 2
Total area:
Area for construction:
14 917 000 rub
2 800 rub/m²
N
← 73,7 м →
← 70 м →
← 72,2 м →
5 065 м²
← 32,3 м →
5 065 m²
3 038 m²
150 kW
3 m³/day
20 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
← 21,9 м →
Plot №9
Line 2
Total area:
Area for construction:
17 219 400 rub
2 800 rub/м²
N
← 67,1 м →
← 72,2 м →
← 65,1 м →
4 548 м²
← 67,4 м →
4 548 м²
2 729 м²
300 кВт
3 m³/day
20 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
Plot №10
Line 2
Total area:
Area for construction:
13 861 400 rub
2 800 rub/m²
N
← 77,5 м →
← 65,1 м →
← 52,2 м →
4 688 м²
← 74 м →
4 688 m²
2 812 m²
150 kW
3 m³/day
20 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
Plot №13
Line 1
Total area:
Area for construction:
52 430 800 rub
2 950 rub/m²
N
17 524 m²
10 522 m²
300 kW
5 m³/day
40 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
← 129 м →
← 157 м →
← 139 м →
17 524 м²
← 111 м →
Land plots on this line are adjacent to the R-21 (E105) highway, which allows to effectively place advertising constructions on the roofs of industrial buildings
Plot №12
Line 1
Total area:
Area for construction:
39 723 700 rub
3 100 rub/m²
N
12 577 m²
7 563 m²
300 kW
5 m³/day
40 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
← 74,6 м →
← 139 м →
← 156 м →
12 577 м²
← 75,5 м →
Land plots on this line are adjacent to the R-21 (E105) highway, which allows to effectively place advertising constructions on the roofs of industrial buildings
Plot №11
Line 1
Total area:
Area for construction:
42 858 050 rub
2 950 rub/m²
N
14 279 m²
8 572 m²
300 kW
5 m³/day
40 m³/hour
Included into price:
electricity supply
water supply
gas supply
Possible to increase capacity!
← 103 м →
← 156 м →
← 158 м →
14 279 м²
← 80 м →
Land plots on this line are adjacent to the R-21 (E105) highway, which allows to effectively place advertising constructions on the roofs of industrial buildings